1/ Basic tools for: |
|||||
|---|---|---|---|---|---|
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
2/ Your choice: installation on framework* or direct to surface |
|---|
| * recommended for walls and ceilings that are damp or in poor condition for installing insulation |
3/ Three possible methods of fixing |
|||
|---|---|---|---|
| GLUEING | STAPLING | SCREWING | |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Download notices for installation |
||
|---|---|---|
| Wall installation: | ![]() |
![]() |
| Ceiling installation: | ![]() |
![]() |